Результаты поиска
-
Conservation Measure Conservation Measure 195/XIX (2000)
than the end of the next reporting period; (iii) a report must be submitted by every Contracting Party ... ; (v) such reports shall specify the month and reporting period (A, B and C) to which each report ...
Conservation Measure : 195/XIX (2000)
-
Conservation Measure Conservation Measure 165/XVII (1998)
New Longline Fisheries for Dissostichus eleginoides in Statistical Division 58.4.4 in the 1998/99 ... intention to conduct new longline fisheries in Statistical Division 58.4.4 for Dissostichus eleginoides in ... the new longline fisheries by France, South Africa, Spain and Uruguay. The fisheries shall be ... 60°S, to be taken by longlining. In the event that this limit is reached, the fisheries shall be ...
Conservation Measure : 165/XVII (1998)
-
WG-FSA-08/60
CONSERVATION MEASURES REGULATING LONGLINE FISHERIES WITHIN THE CONVENTION AREA Author(s) J.M. Fenaughty ... with longline fisheries carried out within the Convention Area are reviewed and changes are suggested ... -01/B (2007) governing research within exploratory fisheries by WG-FSA with a view to assessing the ... exploratory fisheries in Subareas 88.1 and 88.2. SUMMARY OF FINDINGS AS RELATED TO NOMINATED AGENDA ...
Document : Site Section: Publications
-
Conservation Measure Conservation Measure 42-02 (2012)
Secretary no later than the end of the next reporting period; (iii) a report must be submitted by every ... which each report refers; (vi) immediately after the deadline has passed for receipt of the reports ...
Conservation Measure : 42-02 (2012)
-
Conservation Measure Conservation Measure 42-02 (2013)
the end of the next reporting period; (iii) a report must be submitted by every Contracting Party ... report refers; (vi) immediately after the deadline has passed for receipt of the reports for each ...
Conservation Measure : 42-02 (2013)
-
Conservation Measure Conservation Measure 42-02 (2002)
reach the Executive Secretary no later than the end of the next reporting period; (iii) a report must ... period (A, B and C) to which each report refers; (vi) immediately after the deadline has passed for ...
Conservation Measure : 42-02 (2002)
-
Conservation Measure Conservation Measure 42-02 (2003)
than the end of the next reporting period; (iii) a report must be submitted by every Contracting ... report refers; (vi) immediately after the deadline has passed for receipt of the reports for each ...
Conservation Measure : 42-02 (2003)
-
Conservation Measure Conservation Measure 42-02 (2004)
than the end of the next reporting period; (iii) a report must be submitted by every Contracting ... report refers; (vi) immediately after the deadline has passed for receipt of the reports for each ...
Conservation Measure : 42-02 (2004)
-
Conservation Measure Conservation Measure 42-02 (2005)
than the end of the next reporting period; (iii) a report must be submitted by every Contracting ... report refers; (vi) immediately after the deadline has passed for receipt of the reports for each ...
Conservation Measure : 42-02 (2005)
-
Conservation Measure Conservation Measure 42-02 (2006)
end of the next reporting period; (iii) a report must be submitted by every Contracting Party ... ; (v) such reports shall specify the month and reporting period (A, B and C) to which each report ...
Conservation Measure : 42-02 (2006)
Страницы
- « первая
- ‹ предыдущая
- …
- 486
- 487
- 488
- 489
- 490
- 491
- 492
- 493
- 494
- …
- следующая ›
- последняя »